Wind Farm
The collaboration of robotic and hand lancing is a great demonstration of the effectiveness of hydro demolition. This project required the removal of concrete from a wind turbine base to a cut depth of 900mm.
Read moreThe collaboration of robotic and hand lancing is a great demonstration of the effectiveness of hydro demolition. This project required the removal of concrete from a wind turbine base to a cut depth of 900mm.
Read moreAs part of a remediation program Hitech Industrial Services was engaged to deliver hydro demolition services using both robotic and hand lancing methods.
Read moreHitech Industrial Services was contracted to carry out hydro-demolition and ultra-high pressure (UHP) water jetting
Read moreHitech Industrial Services were contracted to carry out hydro demolition for the duration of the Brisbane Bypass Tunnel (Clem 7) project over a period of 2 years. Hydro-demolition was performed on the structural tunnel walls in order to cut out hangers that were damaged when the TBM went past.
Read moreHitech Industrial Services was contracted to remove concrete from expansion joints to a specified depth on the Gateway Bridge (Brisbane) in order to ensure the project was completed on time and avoid onerous penalty clauses for the main contractor.
Read moreRemediation of concrete below a wharf meant that skilled water blasters were suspended via an access platform system to enable them to reach the deck soffit and beams.
Read moreHitech were contracted to remove sections of concrete on a bridge in South Western Sydney
Read moreHydro demolition via hand lancing was used to remove surrounding concrete in order to expose steel water main.
Read moreHitech were required to carry out hydro demolition of concrete to allow for the removal of two bridge bearings.
Read more