Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane
bridge

Gateway Bridge

Project Details

Hydro Demolition
Hitech Industrial Services was contracted to remove concrete from expansion joints to a specified depth on the Gateway Bridge (Brisbane) in order to ensure the project was completed on time and avoid onerous penalty clauses for the main contractor. The original scope of works required that the project was to be undertaken in two (2) stages, with each stage requiring 38 to 40m3 to be removed. Hitech Industrial Services Pty was engaged to ensure the completion of the project without delay. The project was completed in just four (4) weeks with our skilled and dedicated team working day and night.

More Projects

after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more