Gateway Bridge

Project Details

Hydro Demolition
Hitech Industrial Services was contracted to remove concrete from expansion joints to a specified depth on the Gateway Bridge (Brisbane) in order to ensure the project was completed on time and avoid onerous penalty clauses for the main contractor. The original scope of works required that the project was to be undertaken in two (2) stages, with each stage requiring 38 to 40m3 to be removed. Hitech Industrial Services Pty was engaged to ensure the completion of the project without delay. The project was completed in just four (4) weeks with our skilled and dedicated team working day and night.

More Projects

pool after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool image

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more
Head Office: 3 Watsford Road, Campbelltown NSW 2560


Melbourne Branch Office: Ground Floor 435 Nepean Highway, Frankston VIC 3199

Phone: 1300 416 313
Email: info@hitechindustrial.com.au
© 2020 Hitech Industrial Services
Follow us
All Rights Reserved 2020