project wind farm concrete removal

Wind Farm

Project Details

Hydro Demolition
The collaboration of robotic and hand lancing is a great demonstration of the effectiveness of hydro demolition. This project required the removal of concrete from a wind turbine base to a cut depth of 900mm. The outer face being cut by the robotic aquacutter leaving the rebar intact and then extending the beams on the robot to reach the centre of the concrete base. Finally any shadow areas and excess concrete is removed by hand lancing.

More Projects

after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more