bypass tunnel

Brisbane Bypass Tunnel

Project Details

Hydro Demolition
Hitech Industrial Services were contracted to carry out hydro demolition for the duration of the Brisbane Bypass Tunnel (Clem 7) project over a period of 2 years. Hydro-demolition was performed on the structural tunnel walls in order to cut out hangers that were damaged when the TBM went past.