Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane
white bridge

Tugun Bypass

Project Details

Hydro Demolition
Hitech Industrial Services was contracted to carry out hydro-demolition and ultra-high pressure (UHP) water jetting during the construction of the Tugun Bypass project(QLD) . Hydro-demolition was carried out on the structural tunnel walls in order to expose cup links to be for the attachment of reinforcing steel for concrete pours.

More Projects

after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more