Pool Coating Removal in CBD Sydney
As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.
Read moreAs the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.
Read moreOur client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.
Read moreUsing the King Vac truck or the Combination Vacuum Loader Hitech has services regular food and industrial product facilities to remove liquid and solid waste.
Read moreUsing a 3D tank head and high pressure cleaning units this regular preventative maintenance is performed on temperature coil lined stainless steel kettles containing various polymer blends.
Read moreThe collaboration of robotic and hand lancing is a great demonstration of the effectiveness of hydro demolition. This project required the removal of concrete from a wind turbine base to a cut depth of 900mm.
Read moreAs part of a remediation program Hitech Industrial Services was engaged to deliver hydro demolition services using both robotic and hand lancing methods.
Read moreSydney Heritage Fleet engaged Hitech Industrial Services to undertake some industrial high pressure cleaning in the boiler room
Read moreHitech Industrial Services was contracted to carry out hydro-demolition and ultra-high pressure (UHP) water jetting
Read moreHitech Industrial Services were contracted to carry out hydro demolition for the duration of the Brisbane Bypass Tunnel (Clem 7) project over a period of 2 years. Hydro-demolition was performed on the structural tunnel walls in order to cut out hangers that were damaged when the TBM went past.
Read more