Western Sydney Main Water Exposure

Project Details

Category
  • Hydro Demolition

Hydro demolition via hand lancing was used to remove surrounding concrete in order to expose steel water main. This was successfully achieved without causing any damage to the water main, or the remaining concrete.

Gallery

More Projects

  • Sydney Marine Works
    Hitech Industrial Services were contracted to carry out works that consisted of the removal of concrete via Hydro Demolition.
  • Tugun Bypass
    Hitech Industrial Services was contracted to carry out hydro-demolition and ultra-high pressure (UHP) water jetting.
  • Moranbah Mine
    An incorrect batch of concrete had been poured for a section of a blade wall measuring 9.3 metres high, 9.3 metres wide and 1 metre thick.
  • Northern Tunnel Link
    As part of the Legacy Way Transcity Joint Venture, Hitech was engaged to carry out the hydro-demolition of a concrete ramp.