Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane

Sydney Marine Works

Project Details

Category
  • Hydro Demolition

Hitech Industrial Services were contracted to carry out works that consisted of the removal of concrete via Hydro Demolition, enabling remedial works and Surface Preparation of the interlocking steel sheet piles in preparation for anti-corrosion coatings. The reason this method was chosen over standard shot blasting, being that Surface Preparation was also required under water. In areas of high surface pitting, fragments of garnet were introduced into the water jet to remove corrosion from the deeper pits.

Gallery

More Projects

  • Port Botany
    Hitech was contracted to carry out Hydrodemolition on a rail beam at Port Botany Terminal 3.
  • Brisbane Legacy Way
    The Legacy Way project in Brisbane saw Hitech engaged in a range of services including Cold Cutting of pre stressed anchors.
  • Western Sydney Vacuum Loading
    Hitech successfully removed the waste via Vacuum Loading, with a King Vac 9000.
  • Power Station Vales Point

    Hitech was awarded a contract to carry out the removal of concrete cancer underneath a bridge at the Vales Point Power Station.