Northern Link Tunnel

Project Details

Category
  • Concrete Cutting

As part of the Legacy Way Transcity Joint Venture, Hitech was engaged to carry out the hydro-demolition of a concrete ramp. The project included Robotic Hydro Demolition of 42 m3. We utilised an Aqua Spine and our Aquacutter 710v Robot. All work was carried out on night shift due to other work groups in the area.

Hitech achieved 43m3 of concrete removal in 18 nights shifts of work. As a final processwe then mobilised our handgun pump to the site to carry out the removal of any shadows that may have been missed by the robots.

Gallery

More Projects

  • Sydney Marine Works
    Hitech Industrial Services were contracted to carry out works that consisted of the removal of concrete via Hydro Demolition
  • Brisbane Legacy Way
    Another project for Legacy Way in Brisbane saw Hitech contracted to carry out 17,000m2 Hydro Scabbling.
  • Cold Cutting
    Hitech Industrial Services were contracted on a project which involved the cutting of small manholes to 52 tanks both above and below ground to enable cleaning and decommissioning.