Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane

Gateway Bridge

Project Details

Category
  • Hydro Demolition

Hitech Industrial Services was contracted to remove concrete from expansion joints to a specified depth on the Gateway Bridge (Brisbane) in order to ensure the project was completed on time and avoid onerous penalty clauses for the main contractor. The original scope of works required that the project was to be undertaken in two (2) stages, with each stage requiring 38 to 40m3 to be removed. Hitech Industrial Services Pty was engaged to ensure the completion of the project without delay. The project was completed in just four (4) weeks with our skilled and dedicated team working day and night.


Main image by bertknot – Flickr (Some Rights Reserved CC BY SA-2.0)

 

 

More Projects

  • Sydney Jetty Works

    Hitech Industrial Services carried out Hydro Demolition works to the deck of an existing jetty, in preparation for the installation of new service hatches.

  • Brisbane Bypass Tunnel

    Hitech Industrial Services were contracted to carry out hydro demolition for the duration of the Brisbane Bypass Tunnel (Clem 7) project over a period of 2 years.

  • Majura Parkway

    Hitech was awarded this project at the Majura Parkway upgrade in the ACT, due to our unrivalled robotic concrete removal rates.

  • Cold Cutting Mine Site

    In what is believed to be an industry first, Hitech Industrial used its leading cold cutting system to penetrate some 200 metres below ground and cut a ventilation casing at 12-metre intervals so that it could be removed.