Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane

Sydney Jetty Works

Project Details

Category
  • Hydro Demolition

Hitech Industrial Services carried out Hydro Demolition works to the deck of an existing jetty, in preparation for the installation of new service hatches. Removing concrete to form a clear opening of 900mmx900mm was carried out as part of Hitech’s contract, using a diamond floor saw.

Once the cut was made, prior to Hydro Demolition, Hitech allowed for the principal contractor to access the underside of the jetty and erect a debris catching frame, ensuring no pollutants would enter the waterway. Following the erection of the debris and water catching frame, a further 400mm lap length was cut around the 900mmx900mm clear opening, with retention of existing reinforcement for hatch access frame incorporation into the deck reinstatement.

Hydro Demolition via the use of Hi Tech’s 650 HP Pump and 256lpm, paired with our Aquacutter Robot achieved the clients desired result, completing an opening in approximately 90 minutes.

More Projects

  • Port Botany

    Hitech was contracted to carry out Hydrodemolition on a rail beam at Port Botany Terminal 3.

  • Brisbane Legacy Way
    Another project for Legacy Way in Brisbane saw Hitech contracted to carry out 17,000m2 Hydro Scabbling.
  • Tugun Bypass
    Hitech Industrial Services was contracted to carry out hydro-demolition and ultra-high pressure (UHP) water jetting