Hitech was awarded this project at the Majura Parkway upgrade in the ACT, due to our unrivalled robotic concrete removal rates. The area of concrete had to be taken out so the stressing cable duct could be lowered in the slab.
Hitech utilised its Aquacutter robot and handgun for cleaning up any shadows. A total of 3.2m3 of concrete was demolished.
Gallery
More Projects
Mine Site Demolition of ROM Backstop
Hitech were engaged to remove concrete from the face of a ROM Backstop via means of Hydro Demolition, in order for the steel reinforcement to remain intact.