Mine Site Demolition of ROM Backstop

Project Details

Concrete Deterioration
Hitech were engaged to remove concrete from the face of a ROM Backstop via means of Hydro Demolition, in order for the steel reinforcement to remain intact. Two trained operators removed approx 2m³ of concrete with a hand gun operated high pressure pump, within 2.5 shifts including site establishment. The client was pleased with the results we achieved so quickly and was very impressed with the effectiveness of our machine.

More Projects

pool after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool image

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more
Head Office: 3 Watsford Road, Campbelltown NSW 2560


Melbourne Branch Office: Ground Floor 435 Nepean Highway, Frankston VIC 3199

Phone: 1300 416 313
Email: info@hitechindustrial.com.au
© 2020 Hitech Industrial Services
Follow us
All Rights Reserved 2020