Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane
worker host

High Pressure Cleaning Due to Rusting

Project Details

Industrial Cleaning
The underside of a bridge required high pressure water jetting due to rusting of steel reinforcement. The rusting was caused by environmental weathering over time. Hitech cleaned the rust affected concrete with high pressure water and removed the waste bi product via vacuum loading.

More Projects

after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more