Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane

Remediation of a Fishway

Project Details

Category
  • Vacuum Loading

Within flowing waterways, Australian native fish are reliant on various habitat types to ensure their life cycle. This means the free movement within rivers and streams and between estuarine and freshwater environments is necessary.

Over time sand and debris create barriers for this free movement so Water NSW engaged Hitech’s environmentally sensitive method of fish way remediation through vacuum extraction.

Approximately 115 tonnes of sand, soil and debris was removed over 5 days.

Gallery

More Projects

  • High Pressure Cleaning Due to Rusting
    The underside of a bridge required high pressure water jetting due to rusting of steel reinforcement.
  • Paint Removal For New Coating

    Hitech were required to remove approximately 200m² of paint from the inside of a concrete building, to allow for the application of an additional coating.

  • Industrial Cleaning Sydney South West
    Hitech Industrial Services were engaged by a client to clean oil, grease and copper fragments off of a concrete slab at an industrial manufacturing plant.