1300 416 313 | Servicing Sydney, Melbourne & Brisbane
old and destroyed wall

Sydney Remedial Works

Project Details

Simpson Building Group
Surface Preparation
June 1st, 2016
Hitech Industrial Services were required to provide specialized Hydro Demolition works of recent within Sydney to assist the Simpson Building Group in the remediation and preparation of concrete, on a major state government project. Hitech successfully removed affected concrete within the structure via High Pressure Water Jetting. Hitech also assisted in Surface Preparation for the re-bonding of new concrete and application of the surface coating. Hitech’s efficiencies and expertise in the specialized works resulted in a fast turnaround for our client.

Gallery

More Projects

pool after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool image

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more
Head Office: 3 Watsford Road, Campbelltown NSW 2560


Melbourne Branch Office: Ground Floor 435 Nepean Highway, Frankston VIC 3199

Phone: 1300 416 313
Email: info@hitechindustrial.com.au
© 2020 Hitech Industrial Services
Follow us
All Rights Reserved 2020