Hitech Industrial Services were required to provide specialized Hydro Demolition works of recent within Sydney to assist the Simpson Building Group in the remediation and preparation of concrete, on a major state government project.
Hitech successfully removed affected concrete within the structure via High Pressure Water Jetting. Hitech also assisted in Surface Preparation for the re-bonding of new concrete and application of the surface coating. Hitech’s efficiencies and expertise in the specialized works resulted in a fast turnaround for our client.
Gallery
More Projects
Pool Coating Removal in CBD Sydney
As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.
Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.