Sydney Marine Works

Project Details

Hydro Demolition, Surface Preparation
Hitech Industrial Services were contracted to carry out works that consisted of the removal of concrete via Hydro Demolition, enabling remedial works and Surface Preparation of the interlocking steel sheet piles in preparation for anti-corrosion coatings. The reason this method was chosen over standard shot blasting, being that Surface Preparation was also required under water. In areas of high surface pitting, fragments of garnet were introduced into the water jet to remove corrosion from the deeper pits.

More Projects

pool after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool image

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more
Head Office: 3 Watsford Road, Campbelltown NSW 2560


Melbourne Branch Office: Ground Floor 435 Nepean Highway, Frankston VIC 3199

Phone: 1300 416 313
Email: info@hitechindustrial.com.au
© 2020 Hitech Industrial Services
Follow us
All Rights Reserved 2020