Project Details
Concrete Cutting
Hitech was awarded a contract to carry out the removal of concrete cancer underneath a bridge at the Vales Point Power Station. The total project was 79m2 which was carried out by two of our experienced operators using one of our truck mounted Ultra High Pressure Pumps.