Hydro Demolition
Hitech was contracted to carry out Hydro demolition on a rail beam at Port Botany Terminal 3. A total of 18m3 of concrete was to be removed. It was assessed that the most expedient method to do this was with our Aqua cutter robot. Hand guns were subsequently used after the robot had completed its tasks to clean the shadows that the robot may have missed.