Paint Removal For New Coating
Hitech were required to remove approximately 200m² of paint from the inside of a concrete building, to allow for the application of an additional coating.
Read moreHitech were required to remove approximately 200m² of paint from the inside of a concrete building, to allow for the application of an additional coating.
Read moreHitech Industrial Services were required to provide specialized Hydro Demolition works of recent within Sydney to assist the Simpson Building Group
Read moreHitech were engaged to remove concrete from the face of a ROM Backstop via means of Hydro Demolition, in order for the steel reinforcement to remain intact.
Read moreTo enable wharf rehabilitation of a mooring dolphin, Hitech was enlisted to remove the concrete that had become infected with concrete cancer.
Read moreHitech was engaged to remove the concrete beneath a steel plate in a concrete dolphin, located on the coastline of NSW.
Read moreHitech were contracted to remove sections of concrete on a bridge in South Western Sydney
Read moreHydro demolition via hand lancing was used to remove surrounding concrete in order to expose steel water main.
Read moreHitech were required to carry out hydro demolition of concrete to allow for the removal of two bridge bearings.
Read moreHitech Industrial Services carried out Hydro Demolition works to the deck of an existing jetty, in preparation for the installation of new service hatches.
Read more