Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane

Our Projects

“Let our advance worrying become advance thinking and planning.” ~ Winston Churchill

worker removing paint

Paint Removal For New Coating

Industrial Cleaning

Hitech were required to remove approximately 200m² of paint from the inside of a concrete building, to allow for the application of an additional coating.

Read more
old and destroyed wall

Sydney Remedial Works

Surface Preparation

Hitech Industrial Services were required to provide specialized Hydro Demolition works of recent within Sydney to assist the Simpson Building Group

Read more
metal cement work

Mine Site Demolition of ROM Backstop

Concrete Deterioration

Hitech were engaged to remove concrete from the face of a ROM Backstop via means of Hydro Demolition, in order for the steel reinforcement to remain intact.

Read more
concrete work

Northern Queensland Mooring Dolphin Rehabilitation

Concrete Deterioration

To enable wharf rehabilitation of a mooring dolphin, Hitech was enlisted to remove the concrete that had become infected with concrete cancer.

Read more
new castle wharf

Northern Coastline NSW Marine Works

Concrete Deterioration

Hitech was engaged to remove the concrete beneath a steel plate in a concrete dolphin, located on the coastline of NSW.

Read more
wall with hole

South Western Sydney Bridge Repairs

Hydro Demolition

Hitech were contracted to remove sections of concrete on a bridge in South Western Sydney

Read more
exposure main water metal

Western Sydney Main Water Exposure

Hydro Demolition

Hydro demolition via hand lancing was used to remove surrounding concrete in order to expose steel water main.

Read more
bearing underground

Coastal Bridge Bearings

Hydro Demolition

Hitech were required to carry out hydro demolition of concrete to allow for the removal of two bridge bearings.

Read more
square cut concrete work

Sydney Jetty Works

Hydro Demolition

Hitech Industrial Services carried out Hydro Demolition works to the deck of an existing jetty, in preparation for the installation of new service hatches.

Read more