Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane
surface underground work concrete

Northern Link Tunnel

Project Details

Concrete Cutting
As part of the Legacy Way Transcity Joint Venture, Hitech was engaged to carry out the hydro-demolition of a concrete ramp. The project included Robotic Hydro Demolition of 42 m3. We utilised an Aqua Spine and our Aquacutter 710v Robot. All work was carried out on night shift due to other work groups in the area. Hitech achieved 43m3 of concrete removal in 18 nights shifts of work. As a final processwe then mobilised our handgun pump to the site to carry out the removal of any shadows that may have been missed by the robots.

More Projects

after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more