Northern Coastline NSW Marine Works

Project Details

Concrete Deterioration
Hitech was engaged to remove the concrete beneath a steel plate in a concrete dolphin, located on the coastline of NSW. Hitech needed to expose the reinforced steel pins without causing any damage to them. We successfully removed the concrete via handgun, with a two-man crew, allowing for repairs and reconstruction. Extra flooring was also required to be removed along with sections of the concrete chamfer, due to cracks caused by ships docking. Encapsulation and filtration systems were put in place, by means of geofabric to ensure wastewater did not enter the ocean.

More Projects

pool after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool image

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more
Head Office: 3 Watsford Road, Campbelltown NSW 2560


Melbourne Branch Office: Ground Floor 435 Nepean Highway, Frankston VIC 3199

Phone: 1300 416 313
Email: info@hitechindustrial.com.au
© 2020 Hitech Industrial Services
Follow us
All Rights Reserved 2020