Moranbah Mine

Project Details

Concrete Cutting
An incorrect batch of concrete had been poured for a section of a blade wall measuring 9.3 metres high, 9.3 metres wide and 1 metre thick. Using two robotic aqua cutters, Hitech completed the job in FOUR weeks rather than SIX months.