Legacy Way

Project Details

Cold Cutting
The Legacy Way project in Brisbane saw Hitech engaged in a range of services including Cold Cutting of pre stressed anchors. The method of Cold Cutting was used on this project due the anchors being injected with a highly flammable water proofing substance, this didn’t allow for the contractor to use the normal method of de stressing the anchors. Hitech utilized its cold cutting equipment to cut through high tensile strands. There were a total of 7 cables and each cable had 7 strands which were incased in a 250mm diameter casing. All 7 cables were cut including the case all the way through whilst the cables were still stressed.

More Projects

pool after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool image

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more
Head Office: 3 Watsford Road, Campbelltown NSW 2560


Melbourne Branch Office: Ground Floor 435 Nepean Highway, Frankston VIC 3199

Phone: 1300 416 313
Email: info@hitechindustrial.com.au
© 2020 Hitech Industrial Services
Follow us
All Rights Reserved 2020