1300 416 313 | Servicing Sydney, Melbourne & Brisbane
cockatoo island

Cockatoo Island

Project Details

Hydro Demolition
Hitech Industrial Services was contracted by to remove areas of concrete that had been identified as suffering from concrete cancer at Cockatoo Island. Ultra High Pressure (UHP) Hydro demolition was chosen as the most effective method of removing the impacted concrete without affecting the structural integrity of the sound concrete, unaffected by concrete cancer. The use of traditional concrete removal methods, such as jackhammers, could cause micro-cracks in the existing concrete structure.

More Projects

pool after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool image

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more
Head Office: 3 Watsford Road, Campbelltown NSW 2560


Melbourne Branch Office: Ground Floor 435 Nepean Highway, Frankston VIC 3199

Phone: 1300 416 313
Email: info@hitechindustrial.com.au
© 2020 Hitech Industrial Services
Follow us
All Rights Reserved 2020