Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane
hydro scabbling a tunnel

Brisbane Legacy Way

Project Details

Hydro Demolition
Another project for Legacy Way in Brisbane saw Hitech contracted to carry out 17,000m2 Hydro Scabbling. This involved two Ultra High Pressure units working out of elevated work platforms and scissor lifts.

More Projects

after removing the coating

Pool Coating Removal in CBD Sydney

As the images show this CBD pool in Sydney was in a busy location and our client was keen that the project was undertaken as efficiently and expediently as possible.

Read more
surface preparation pool

Regional NSW – Swimming Pool Surface Preparation

Our client requested a methodology that could remove paint and built up coating to be removed during winter when the normally busy public pool and associated learners pool would be closed and renovated.

Read more