Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane

Port Botany

Project Details

Category
  • Hydro Demolition
Hitech was contracted to carry out Hydro demolition on a rail beam at Port Botany Terminal 3. A total of 18m3 of concrete was to be removed. It was assessed that the most expedient method to do this was with our Aqua cutter robot. Hand guns were subsequently used after the robot had completed its tasks to clean the shadows that the robot may have missed.

More Projects

  • Gateway Bridge
    Hitech Industrial Services was contracted to remove concrete from expansion joints to a specified depth on the Gateway Bridge (Brisbane) in order to ensure the project was completed on time and avoid onerous penalty clauses for the main contractor.
  • Hydro Demolition of Wharf
    Remediation of concrete below a wharf meant that skilled water blasters were suspended via an access platform system to enable them to reach the deck soffit and beams
  • Tugun Bypass
    Hitech Industrial Services was contracted to carry out hydro-demolition and ultra-high pressure (UHP) water jetting