To enable wharf rehabilitation of a mooring dolphin, Hitech was enlisted to remove the concrete that had become infected with concrete cancer.
Hitech utilised Hydro Demolition, by means of handgun over four stages of works, which included the Ultra High-Pressure Jetting of the dolphin soffit and piles. Hitech successfully removed 100m² of concrete.
More Projects
Northern Coastline NSW Marine Works
Hitech was engaged to remove the concrete beneath a steel plate in a concrete dolphin, located on the coastline of NSW.
Hitech were required to remove approximately 200m² of paint from the inside of a concrete building, to allow for the application of an additional coating.
Hitech Industrial Services were required to cut an access point into a buried unleaded fuel tank for decommissioning at MicK’s Mechanical Repairs yard in Smithfield.