Mine Site Demolition of ROM Backstop

Project Details

Category
  • Concrete Deterioration
Hitech were engaged to remove concrete from the face of a ROM Backstop via means of Hydro Demolition, in order for the steel reinforcement to remain intact. Two trained operators removed approx 2m³ of concrete with a hand gun operated high pressure pump, within 2.5 shifts including site establishment. The client was pleased with the results we achieved so quickly and was very impressed with the effectiveness of our machine.

More Projects

  • Majura Parkway

    Hitech was awarded this project at the Majura Parkway upgrade in the ACT, due to our unrivalled robotic concrete removal rates.

  • Northern Queensland Mooring Dolphin Rehabilitation
    To enable wharf rehabilitation of a mooring dolphin, Hitech was enlisted to remove the concrete that had become infected with concrete cancer.
  • Kurnell Desalination Plant
    Hitech Industrial Services were contracted to prepare the inside surface of concrete tanks at the Kurnell Desalination Plant