Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane

Industrial Cleaning in Polyurethane Plant

Project Details

Category
  • Industrial Cleaning

Using a 3D tank head and high pressure cleaning units this regular preventative maintenance is performed on temperature coil lined stainless steel kettles containing various polymer blends. The automatic tank head means that there is limited (to nil) confined space access requirements as the unit removes deposits and hardened materials using high pressure water. This is also means that no other energy resources or additional cleaning materials are required. The nozzle of the tank head arm rotates due to the reaction of the water and the jets which emit from the nozzles. The speed being controlled by a brake magnet.

Gallery

More Projects

  • Gateway Bridge

    Hitech Industrial Services was contracted to remove concrete from expansion joints to a specified depth on the Gateway Bridge (Brisbane) in order to ensure the project was completed on time and avoid onerous penalty clauses for the main contractor.

  • Cockatoo Island

    Hitech Industrial Services was contracted by to remove areas of concrete that had been identified as suffering from concrete cancer at Cockatoo Island.

  • Port Botany

    Hitech was contracted to carry out Hydro demolition on a rail beam at Port Botany Terminal 3.