Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane

Cockatoo Island

Project Details

Category
  • Hydro Demolition
Hitech Industrial Services was contracted by to remove areas of concrete that had been identified as suffering from concrete cancer at Cockatoo Island. Ultra High Pressure (UHP) Hydro demolition was chosen as the most effective method of removing the impacted concrete without affecting the structural integrity of the sound concrete, unaffected by concrete cancer. The use of traditional concrete removal methods, such as jackhammers, could cause micro-cracks in the existing concrete structure.

Gallery

More Projects

  • Brisbane Legacy Way

    Another project for Legacy Way in Brisbane saw Hitech contracted to carry out 17,000m2 Hydro Scabbling.

  • Gateway Bridge

    Hitech Industrial Services was contracted to remove concrete from expansion joints to a specified depth on the Gateway Bridge (Brisbane).

  • Tugun Bypass

    Hitech Industrial Services was contracted to carry out hydro-demolition and ultra-high pressure (UHP) water jetting.

  • Coastal Bridge Bearings

    Hitech were required to carry out hydro demolition of concrete to allow for the removal of two bridge bearings.