Hi Tech was contracted to carry out Hydrodemolition on a rail beam at Port Botany Terminal 3. A total of 18m3 of concrete was to be removed.It was assessed that the most expedient method to do this was with our Aquacutter robot. Hand guns were subsequently used after the robot had completed its tasks to clean the shadows that the robot may have missed. Robotic and Hand Gun Hydrodemolition - Port Botany Terminal 3