As part of the Legacy Way Transcity Joint Venture, Hi Tech was engaged to carry out hydro demolition of a concrete ramp.The project included Robotic Hydro Demolition of 42 m3.

 

We utilised an Aqua Spine and our Aquacutter 710v Robot.All work was carried out on night shift due to other work groups in the area. Hi Tech achieved 43m3 of concrete removal in 18 nights shifts of work. As a final process we then mobilised our hand gun pump to site to carry out removal of any shadows that may have been missed by the robots.

Robotic Hydrodemolition Northern Link Tunnel