1423136630 social style 3 pinterest-128 LinkedinIcon facebookIcon Twittericon
     youtubeIcon


1300 416 313

SYDNEY - BRISBANE - MELBOURNE

20150529 004825 640x360

Hi Tech were contracted to remove sections of concrete on a bridge in South Western Sydney, that had become infected with concrete cancer. Hi Tech needed to expose the steel reinforcement without causing any cracking to remaining structure, allowing for ongoing repairs. Hi Tech successfully removed the concrete via Hydro Demolition, utilising ultra high pressure water and hand lancing.