Remediation of concrete below a wharf meant that skilled water blasters were suspended via an access platform system to enable them to reach the deck soffit and beams. Due to...

Read more

Remediation of a…

Within flowing waterways, Australian native fish are reliant on various habitat types to ensure their life cycle. This means the free movement within rivers and streams and between estuarine and...

Read more

Cold Cutting- Mi…

In what is believed to be an industry first, Hi Tech Industrial used its leading cold cutting system to penetrate some 200 metres below ground and cut a ventilation casing...

Read more

High Pressure Cl…

The underside of a bridge required high pressure water jetting due to rusting of steel reinforcement. The rusting was caused by environmental weathering over time. Hi Tech cleaned the rust...

Read more

Paint removal fo…

Hi Tech were required to remove approximately 200m² of paint from the inside of a concrete building, to allow for the application of an additional coating. Hi Tech utilised a...

Read more

Sydney Remedial …

Hi Tech Industrial Services were required to provide specialised Hydro Demolition works of recent within Sydney to assist the Simpson Building Group in the remediation and preparation of concrete, on...

Read more

Mine Site Demoli…

Hi Tech were engaged to remove concrete from the face of a ROM Backstop via means of Hydro Demolition, in order for the steel reinforcement to remain intact. Two trained...

Read more

Mooring Dolphin …

To enable wharf rehabilitation of a mooring dolphin, Hi Tech were enlisted to remove the concrete that had become infected with concrete cancer. Hi Tech utilised Hydro Demolition, by means...

Read more

NSW Marine Works

Hi Tech were engaged to remove the concrete beneath a steel plate in a concrete dolphin, located on the coastline of NSW.Hi Tech needed to expose the reinforced steel pins...

Read more

South Western Sy…

Hi Tech were contracted to remove sections of concrete on a bridge in South Western Sydney, that had become infected with concrete cancer. Hi Tech needed to expose the steel...

Read more

Smithfield Cold …

  Hi Tech Industrial Services were required to cut an access point into a buried unleaded fuel tank for decommissioning at MicK's Mechanical Repairs yard in Smithfield. Hi Tech utilised the Cold...

Read more

Western Sydney W…

Hydro demolition via hand lancing was used to remove surrounding concrete in order to expose steel water main. This was successfully achieved without causing any damage to the water main...

Read more

Coastal Bridge B…

Hi Tech were required to carry out hydro demolition of concrete to allow for the removal of two bridge bearings. Hydro Demolition was the method of choice assessed by Hi...

Read more

Sydney Jetty Wor…

Hi Tech Industrial Services carried out Hydro Demolition works to the deck of an existing jetty, in preparation for the installation of new service hatches.Removing concrete to from a clear...

Read more

Western Sydney V…

  Hi Tech Industrial Services were requested within the South-Western Sydney region to assist with the removal of waste water and sewerage solids from an interceptor holding pit with restricted access.Hi...

Read more

Industrial Clean…

Hi Tech Industrial Services were engaged by a client to clean oil, grease and copper fragments off of a concrete slab at an industrial manufacturing plant. Hi Tech utilised a...

Read more

Sydney Marine Wo…

  Hi Tech Industrial Services were contracted to carry out works that consisted of the removal of concrete via Hydro Demolition, enabling remedial works and Surface Preparation of the interlocking steel...

Read more

Western Sydney C…

Hi Tech Industrial Services were contracted on a project which invloved the cutting of small man holes to 52 tanks both above and below ground to enable cleaning and decommissioning. Over a...

Read more

Sydney Fish Mark…

Hi Tech was contracted to carry 3600m2 of surface preparation at Sydney fish markets. This was carried out over a 36 hour series of shutdowns on weekends whilst the markets...

Read more

Brisbane Legacy …

Another project for Legacy Way in Brisbane saw Hi Tech contracted to carry out 17,000m2 Hydro Scabbling. This involved two Ultra High Pressure units working out of elevated work platforms and...

Read more

Legacy Way

The Legacy Way project in Brisbane saw Hi Tech engaged in a range of services including Cold Cutting of pre stressed anchors.The method of Cold Cutting was used on this...

Read more

Port Botany

Hi Tech was contracted to carry out Hydrodemolition on a rail beam at Port Botany Terminal 3. A total of 18m3 of concrete was to be removed.It was assessed that...

Read more

Majura Parkway

Hi Tech  was awarded this project at the Majura Parkway upgrade in the ACT, due to our unrivalled robotic concrete removal rates. The area of concrete had to be taken...

Read more

Power Station - …

Hi Tech was awarded a contract to carry out the removal of concrete cancer underneath a bridge at the Vales Point Power Station. The total project was 79m2 which was...

Read more

Northern Link Tu…

As part of the Legacy Way Transcity Joint Venture, Hi Tech was engaged to carry out hydro demolition of a concrete ramp.The project included Robotic Hydro Demolition of 42 m3.   We...

Read more

Moranbah Mine

An incorrect batch of concrete had been poured for a section of a blade wall measuring 9.3 metres high, 9.3 metres wide and 1 metre thick.Using two robotic aqua cutters,Hi...

Read more

Gateway Bridge

Hi Tech Industrial Services was contracted to remove concrete from expansion joints to a specified depth on the Gateway Bridge (Brisbane) in order to ensure the project was completed on...

Read more

Tugun Bypass

Hi Tech Industrial Services was contracted to carry out hydro demolition and ultra high pressure (UHP) water jetting during the construction of the Tugun Bypass project(QLD) . Hydro demolition was...

Read more

Kurnell Desalina…

Hi Tech Industrial Services were contracted to prepare the inside surface of concrete tanks at the Kurnell Desalination Plant, to ensure the sealant applied to waterproof the tank surface had...

Read more

Brisbane Bypass …

Hi Tech Industrial Services were contracted to carry out hydro demolition for the duration of the Brisbane Bypass Tunnel (Clem 7) project over a period of 2 years. Hydro demolition...

Read more

Cockatoo Island

Hi Tech Industrial Services was contracted by to remove areas of concrete that had been identified as suffering from concrete cancer at Cockatoo Island. Ultra High Pressure (UHP) Hydro demolition...

Read more